Production

Our own site in Korolev: cutting, welding, assembly, services and finishing under one roof. Here is how the cycle runs.

14,000
m² of production floor
24
capsules per month at design capacity
60
days of build time
50
years of design service life

The production cycle

01

Cutting and frame welding

Box section is CNC-cut and the frame is welded in a jig, so geometry repeats from body to body.

02

Anti-corrosion treatment

Shot blasting, primer, powder coating. The frame is sealed against corrosion before the shell goes on.

03

Shell and insulation

Formed aluminium panels to a template, 150 or 250 mm of insulation, a continuous vapour barrier.

04

Building services

Power, water, drainage, ventilation and climate are installed before the walls close and are pressure-tested.

05

Glazing and interior

Panoramic Low-E glazing, final finishes, kitchen, bathroom, built-in furniture.

06

Acceptance and packing

Every system run under load, a 140-point checklist, then weatherproofing and securing to the trailer.

Quality control

Every body goes through the same end-to-end checklist. The acceptance record is handed to the client with the unit's documentation.

Production site12 Promyshlennaya St., Korolev, Moscow Region, Russia
  • Pressure test of the water loop and fall check on the drainage
  • Insulation resistance measurement and electrical run under load
  • Thermal imaging of the shell for cold bridges
  • Frame geometry and glazing seating check
  • Climate and ventilation run through every operating mode
  • Final acceptance against a 140-point checklist